The project
The first photograph captures this roof during the work, after the covering has been removed and the underlay and timber battens are in place. It shows the shape of the hipped roof clearly, along with a brick chimney and a dormer on the adjoining section. Because this is a progress photograph rather than a view of the original roof, it does not establish why the previous covering was replaced.
What was required
The prepared slopes needed a tiled covering that followed the batten layout and met neatly along the hips. The chimney and the junction with the neighbouring roof introduced extra details beyond the main field of tiles. Getting those transitions right is what gives a hipped roof a coherent finish rather than making each slope look like a separate piece of work.
Work completed
- Roofing underlay and timber battens laid across the visible slopes
- Brown roof tiles fitted in consistent courses
- Hip caps fitted along the sloping roof junctions
- Tiling finished around the existing brick chimney
- Roof covering brought neatly into the adjoining dormer area
Materials used
The photographs show roofing underlay, timber battens, brown roof tiles and matching hip caps. Flashing is visible at the chimney junction. Product brands, tile composition and the condition of the hidden roof structure cannot be confirmed from these images.
The result
The finished view shows an even tiled surface with clearly defined hip lines. The brown covering works with the existing chimney and the adjoining roof, while the dormer remains part of the original roof layout. Seeing the preparation alongside the finished covering makes the sequence of the re-tiling work easy to follow.
In conclusion
The finished tiles are only one part of a re-roof. This pair also shows the preparation beneath them and how a roof with several slopes needs a consistent layout from the battens through to the hip details.